What We Do

What We Do

Water

Our water projects include some that require miles of new main line up to 24″ PVC or DIP to be installed, rework of existing infrastructure, or the installation of domestic or fire taps to provide service to your project. We have rebuilt and installed large meter structures and major and minor PRV(Pressure Reducing Valves) and structures. In addition, we have been called upon to install such specialized systems as high pressure onsite fire protection with operating pressures exceeding 250psi.
We have also performed boring and jacking up to 300′ with a 42″ profiled casing. JBM has provided our clients with emergency contact information to deal with their unexpected issues.

Sewer

Our sewer projects range from the installation of one single service to installation of miles of main up to 12″ PVC. Some of our systems include the installation of large sewer lift stations, sand oil vaults, and drop manholes.
Some of our clients special needs have required us to perform our work in downtown Las Vegas while other projects required us to preform our trade at depths of 34′ in solid rock.

Storm

JBM preforms storm drain projects that include pipe sizes from 6″ through 10’x20′ double barrel RCB (Reinforced Concrete Box) and everything in between. We have installed these systems to depths past 25′ in all types of soil.